Sunday, April 6, 2008

Chapter 9 - Landing brake - Part 2

I did more work on the landing brake today. Here I have 5 min. epoxied the 3 LB22 aluminum blocks to the "front" of LB23 (1/4" spruce plywood). These aluminum blocks will later be drilled out and tapped to receive bolts to attach to the piano hinge for the landing brake.



Test fitting LB 23 with aluminum blocks attached with epoxy. This piece is later micro'd in place.


Landing brake recess ready for glassing


Landign brake resess after glassing.




No comments: