Tuesday, January 12, 2010

Chapter 14 - Center section Spar - Part 3

Happy new year everyone.

The last few weeks I have managed to work steadily on completing the center spar. Today the spar is complete (except for 2 2-1/2" access holes).

The plans call for the spar to be permanently installed at this time. I think however that I will not do that. The EZ takes up a lot of shop space with the center spar and canard installed. If I leave the center spar off and remove the canard, I will have plenty of room in the shop to complete the last of the large layups on the big work table, the wings. I believe that after the wings are complete, I can disassemble the large work table, or cut it down to take less space while I complete the spar installation and build the wing strakes.

Here are some photos of the spar completion:


Here is the center spar after the spar cap layups and the aft bid exterior layups. The 4 aluminium plates are floxed into place. 3 plies UNI glass are layed up over each of these hard points.

After the UIN layups are cured, the center access hole is cut and 3 plies BID is layed up over the foward face of the spar. This hole will allow access to the inside of the center spar for wing attach nuts. This space will also be a baggage compartment behind the passenger seat.

Here is another view of the completed spar.

And here is the spar temporarily installed into the fuselage.

Monday, December 21, 2009

Chapter 14 - Center section Spar - Part 2

We had quite the cold snap here in the north west and heating the shop to acceptable temperatures had been futile until late last week. With the help of a couple of heaters I managed to get the shop warmed up enough to do some layups.

Here is the inside of the center section spar with the internal glass plies and bulkheads. In this photo the top of the spar is on the right. The bottom, on the left, has a slight dihedral. The aft face is down and the forward face is up. In the right background is pictured the 3 panels, glassed on the inside surface, that will be the forward face of the spar.

Here is another picture of the 3 forward panels ready to micro in place.

Here pictured is the spar after the forward face has been bonded in place and the spar cap troughs have been carved.

Pictured here are the 6 1/4" attachment point reenforcement pieces. Each of these locations will later be drilled to receive 1/2" bolts attaching the wings to this center spar.

And yesterday I completed laying up the center spar shear web. Next up are the spar caps.




Wednesday, December 2, 2009

Chapter 14 - Center section Spar (and misc photos)

Materials for my Center Section Spar should arrive via the magic brown van tomorrow.

While waiting for the materials (1/4" divinicell foam, aluminium, fiberglass and epoxy) I dug out the spar jig that I built many months ago. I cut the urethane foam parts (which are pictured test fitted into the jig).

I also cut the 1/8" aluminium attachment renforcement peices (the remaining reinforcement parts will be cut when I recieve the 1/4" stock tomorrow).

Finally I cut the 8 spar cap templates.

MISC. Photos...

Here is a photo of a cover I installed just forward of the instrument panel. the two triangular "flanges", just aft and on the left and right of the panel, will provide a surface for the a gasket on the canopy to seal against.

Also here is a picture of the final nose shape. My brother commented that I never posted a final photo. The top of the nose still remains to be glassed because I want better access to install brake resivoirs and other items before it is glassed in place. I also want to find a clean way of instlling the access hatch.

Sunday, November 15, 2009

Chapter 13 - Nose - Complete!

Ok, I admit that saying this chapter is complete is a little inaccurate. I still have to install the static port, pitot tube and complete the nose access hatch. However I am going to wait on closing up the nose until more work in that area is complete. Next up will be the main spar.

I finally have finished fabricating all of the rudder/brake pedal parts. Tomorrow I should be receiving some hardware from Aircraft Spruce to complete the installation. What follows are some photos of the left pedal test assembled:

Here is a shot of both pedals. Only the left (pictured on the right) has the brake parts installed at this stage.

Here is a shot of the pedal in the position it will normally be, with the rudder un-delployed.

Here the pedal is in the positioned where the rudder will be fully deployed, but just before brake pressure is applied.

Another shot in the un-deployed state:

Wednesday, October 14, 2009

Chapter 13/18 - Nose and Canopy - Part 6

It has been a while since I have done any work on my project and I have been getting a little upset at myself for not making more progress. So, today I got back into the shop and finished up fabrication of the the rudder/brake pedals.

I am finding gas welding a little easier now, however I wouldn't say I am good at it yet. The following pictures show the completed rudder/brake pedals. The plans call for the brake master cylinders to be mounted on the firewall and are actuated by a cable via a bell crank (also mounted on the firewall).

Most folks these days are opting to mount the master cylinders up front to make for extra room for O-320 installation.

The design of the linkages are my own, however they are inspired by examples of others I have seen on the web.


Here is the pedal in the neutral position (rudder not retracted).

And here is the position of the rudder pedal with the rudder in the fully extended position and just before any brake pressure is applied.

And finally the full rudder and brake pressure position.

Thursday, September 17, 2009

Chapter 13/18 - Nose and Canopy - Part 5

Slow progress lately. I did some more finish work on the canopy frame and I still have quite a bit more to go.
I have also done more work up front in the nose area. I fabricated nose access panel, completed the canard attachment installation including reinforcement layers of glass and installation of the nutplates.

Also after much practice I have nearly finished welding the rudder pedals. They certainly are not pretty, but I think they will work out fine. I still need to attach some sort of bracket to attach each brake master cylinders, however I will wait until I have those on hand and know exactly how they will be installed.










Sunday, August 9, 2009

Chapter 13/18 - Nose and Canopy - Part 4

Wow, over a month since my last post, and I have done so much work.

I had promised to post an update after the interior canopy glass layups were completed, but I got a little carried away and nearly finished the canopy on the inside. I also worked a little on finnishing the canopy exterior with micro fillets. Here are some photos of my progress over the last month...

Here I have completed glassing the lower half of the nose after flipping the aircraft upside down. At this stage the task of rolling the airplane over with landing gear installed is just barely manageble by myself.

Here is a photo of the interior of the canopy, nearly finnished and ready for primer. I probably have a couple more micro applicatoins and final sanding. I was a little concerned after initial glassing that the pexiglass, fiberglass joint would be so ugly, however with a little masinking tape and micro, the final result will be quite nice.



Here area few shots of the canopy exterior after the first couple of micro applications to give a nice even transition from the fiberglass skin to the pexiglass. A couple more micro applications will make the transition really nice. I also will have some work to make a nice clean transition/joint where the canopy and fuselage meet.