Thursday, July 31, 2008

Chapter 10 - Canard construction - Part 1

Well here I begin with an all new part of this project, the canard. I finally get to let the fuselage rest and collect some dust while I work on something different.

I am going to build the "Special performance canard" or better known as the Roncz R1145MS.

Rutan stopped selling plans so I have figured out a way of scaling the scanned images available on the TERF-CD. With that and some other data I have found, I feel confident that I can produce accurate jigs for this part of the project. However, to ensure that the canard is built as accurate and correct as possible and to minimize tooling and time, I have placed an order with Eureca CNC for precut cores. I have heard good things about the quality of Steve's (the owner, creator, etc of Eureka) product.

Unfortunately (for me anyhow) at this time Steve is at Oshkosh and he will not be able to ship my canard cores until next week at the soonest. So, in the meantime, I have begun fabricating some of the hardware. Pictured are the two aluminum lift tabs and the nut plates I made from anchor nuts riveted to an aluminum plate.

Sunday, July 20, 2008

Chapter 9 - Complete!

Finally chapter 9 is complete. Today I finished fairing the landing break and installing the linear actuator. To be truthful I actually need to do some finish work on the top bracket and the landing break and surrounding areas still need some finishing work. I just don't want to get to crazy making everything perfect until the finishing stages of the project.

A couple of photos of the landing break:



And a video for your viewing pleasure:

Saturday, July 5, 2008

Chapter 9 - Main gear - Part 3

Progress on this project has been quite slow lately. I have been very slowly working on getting the main gear axles installed. The plans do not describe this process in much detail and I had a hard time figuring out how to mount the flat axle and flat aluminum plate to a somewhat oval shaped strut.

I ended up laying a thin flox bed on the strut and clamping the axle in place with some plastic in place to keep the strut from bonding. I then sanded the flox flat.

Then I spread the strut apart with a come-a-long and wedged it with a 4x4. I then mounted it upside down on the fuselage. I was not quite clear why this was recommended (by a forum contributer) however I realized was able to ensure the axles were mounted at the same waterline (height) when the full weight of the aircraft is bearing down on the gear.

I then took the strut down and clamped it to the side of my work bench. I carefully measured for toe in and sanded the cured flox flats until the axles were in the proper position. I then layed up 6 ply of bid and, using clamps, bonded the axles to the strut.

After the axles were cured and glass trimmed, I bonded 3"x3" aluminum plates to the inside of the strut with 10 layers of bid (I used 10 to ensure the plate was relatively flat and parallel to the axle. After that cured I trimmed the aluminum plate and made fine adjustments to the strut to ensure the break parts will not bind on the strut.

You may notice the many hardware store washers on the bolts mounting the axles. The bolts are too long and I will order some shorter bolts and discard the washers.




Saturday, May 17, 2008

She stands!

Not much real progress to report here. I have almost completed the landing gear mounting steps and tomorrow I will begin preparations for mounting the axles.

Nevertheless I think this is sort of a milestone because the bird is standing on its own two feet for the first time.




First time on it's own two (soon to be three) feet (soon to be wheels)....

Thursday, May 15, 2008

Chapter 9 - Main gear - Part 2

More work on the main gear today. This stage has turned out to be quite involved. But I am almost done. Unfortunately I only ordered two of the large washers that are to be floxed and glassed to the outside of the gear attach tabs. I will need to order two more and flox/glass them in place to complete this step.

Here the outer glass tabs are ready with flox fillets for the inner glass tab layups.


Here are the first of the inner glass layups. The clamps are lightly tightened down to hold the glass layers in place during cure.


The inner glass layups completed, cured and trimmed. Holes bored through all layups and the steel tube inserted.


The plans call for a foam peice to be shaped and inserted between the steel tubes and the main gear. However it was suggested that the foam piece be replaced with flox, which is what I did. After troweling on the flox I layed up two plies BID over the tubes and the outer washers (only on the left tabs because I ordered two few, the other two will be installed when I have them in from ACS).

Saturday, May 10, 2008

Engine mount

Time for a little diversion. I am awaiting a counter bore tool and some hardware from ACS to finnish up the mounting of the main gear strut. In the meantime I have been working on an engine mount I acquired. After some unexpected debating between folks on the builders forum, I settled on refurbishing the mount as follows:

First was to bead blast, followed by a primer coat and finally a few coats of white paint. At first I intended to have the mount powder coated. However it was advised from a few sources that powder coating could make detection and repair of any cracks that may form (apparently a common occurrence with these mounts) more difficult. I also removed all the little screws you can see pictured and squirted in some linseed oil to deter corrosion.

Here is the mount as I received it..


After bead blasting by my brothers coleages Jeff and Deano. Thanks guys!


Jeff and Deano discovered two "cracks" I am not sure if they really could be considered cracks or just minor weld defects. They went ahead and performed two pea sized repairs....




Then after squirting some linsead oil into the tubing (through the little screw holes), the mount was primed..


And painted...

Monday, April 28, 2008

Chapter 9 - Main gear

I have begun installation of the main gear attach tabs. Actually this is my second go. The first time around I had the first of the BID and UNI layups inplace. Unfortunatly I got distracted and the gear bow fell off the workbench and the plywood tabs all broke off. Lesson learned, this time around I secured the bow with a wire...

Here is the main gear strut leveled on the ply wood tabs.


And here is a closeup of the plywood tabs. Note the bondo holding the strut in place. Not visible are shims between the strut and the steel tubes.


Another view of the temporary plywood tabs just prior to removal of the steel tubes.


Here the strut is staged for the first of the UNI and BID layups. Note the wire to hold the strut down and the duct tape to prevent the temporary plywood tabs from bonding to the glass.


The first layers of glass tabs after initial trimming.